Daisy Hill Farm

Daisy Hill Farm at Saltend North

Northern Powergrid Embedded Capacity Register 1MW and Over, July 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Daisy Hill Farm
Site name
Daisy Hill Farm
Address
Daisy Lee Farm, Scammonden, Huddersfield, West Yorkshire, HD3 3FJ
Grid reference
Easting 407337, northing 417021
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Saltend North
Bulk supply point
Saltend 132/33kV
Primary substation
Daisy Hill Farm
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 35 MW registered
Registered capacity
35 MW
Change to maximum export capacity
35 MW
Change to maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
19 May 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Jun 2023
Tracked since
March 2026 edition

Change history

Tracked from the March 2026 edition to the July 2026 edition, across 5 editions.

Changes to the details QueueWatch tracks, newest first.

  • August 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

No change to any detail QueueWatch tracks.

Also at Saltend North

GSP view

32 other sites at this grid supply point in the November 2026 edition, 1 of them at Daisy Hill Farm, the same primary substation. In all, the sites here total 971 MW: 119 MW connected, 852 MW accepted to connect.

  • Daisy Hill Farm PVDaisy Hill Farm PV, Solar, Daisy Hill Farm primaryAccepted35 MW
  • NEL Suggit BESSNEL Suggit BESS, Storage, NEL Suggit BESS Direct primaryAccepted240 MW
  • NEL Limes BESSNEL Limes BESS, Storage, NEL Suggit BESS Direct primaryAccepted200 MW
  • Magdalen Farm HybridMagdalen Farm Hybrid, Solar, Magdalen Farm Hybrid Direct primaryAccepted70.15 MW
  • Great Field LaneGreat Field Lane BESS, Storage, Great Field Lane BESS Direct primaryAccepted60 MW
  • Aldbrough Gas StorageAldbrough Gas Storage, Gas and other fossil, Aldbrough Gas Caverns Direct primaryAccepted50 MW
  • High Bridge Farm HybridHigh Bridge Farm Hybrid, Storage, High Bridge Farm Hybrid Direct primaryAccepted50 MW
  • Trinity House SolarTrinity House Solar, Solar, Trinity House Solar Direct primaryAccepted49.9 MW

See all 32

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?