QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Cranswick Country Foods

Cranswick Country Foods at Saltend North

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
2 Sep 2018
Status
Connected
Customer
Cranswick Country Foods
Site name
Cranswick Country Foods
Address
Cranswick Country Foods, Staithes Road, Hull, North Yorkshire, HU12 8TB
Grid reference
Easting 518414, northing 430453
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Saltend North
Bulk supply point
Hull East 132/33kV
Primary substation
Hedon Road
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam turbine (thermal power plant): 2.053 MW registered
Registered capacity
2.053 MW
Maximum export capacity
2 MW
Maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
11 Dec 2017
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394000137710
Import MPAN
Not stated
Last updated
5 Jan 2018
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Saltend North

GSP view

31 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 971 MW: 119 MW connected, 852 MW accepted to connect.

  • NEL Suggit BESSNEL Suggit BESS, Storage, NEL Suggit BESS Direct primaryAccepted240 MW
  • NEL Limes BESSNEL Limes BESS, Storage, NEL Suggit BESS Direct primaryAccepted200 MW
  • Magdalen Farm HybridMagdalen Farm Hybrid, Solar, Magdalen Farm Hybrid Direct primaryAccepted70.15 MW
  • Great Field LaneGreat Field Lane BESS, Storage, Great Field Lane BESS Direct primaryAccepted60 MW
  • Aldbrough Gas StorageAldbrough Gas Storage, Gas and other fossil, Aldbrough Gas Caverns Direct primaryAccepted50 MW
  • High Bridge Farm HybridHigh Bridge Farm Hybrid, Storage, High Bridge Farm Hybrid Direct primaryAccepted50 MW
  • Trinity House SolarTrinity House Solar, Solar, Trinity House Solar Direct primaryAccepted49.9 MW
  • Harbour Farm PVHarbour Farm PV, Solar, Harbour Farm PV primaryAccepted42 MW

See all 31

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?