Castle Hill Hospital
Castle Hill Hospital Gas at Creyke Beck
Northern Powergrid Embedded Capacity Register 1MW and Over, June 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Feb 2022
- Status
- Connected
- Customer
- Castle Hill Hospital Gas
- Site name
- Castle Hill Hospital
- Address
- Castle Hill Hospital, Castle Road, Cottingham, North Yorkshire, HU16 5JQ
- Grid reference
- Easting 502472, northing 432348
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Creyke Beck
- Bulk supply point
- Hull South
- Primary substation
- County Road North
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Steam turbine (thermal power plant): 1.521 MW registered
- Registered capacity
- 1.521 MW
- Maximum export capacity
- 1.521 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 19 Jan 2021
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 2394200155056
- Import MPAN
- 2380002769018
- Last updated
- 10 Feb 2021
- Tracked since
- June 2026 edition
Change history
Found in the June 2026 edition only.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
- July 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at Creyke Beck
GSP view69 other sites at this grid supply point in the September 2026 edition, 3 of them at County Road North, the same primary substation. In all, the sites here total 1.9 GW: 0.6 GW connected, 1.3 GW accepted to connect.
- Hull University Teaching Hospitals NHS Trust BESSHull University Teaching Hospitals NHS Trust PV, Storage, County Road North primaryAccepted6 MW
- Castle Hill Hospital CHPCastle Hill Hospital Gas, Gas and other fossil, County Road North primaryConnected1.521 MW
- Kenley House Generation HubKenley House Generation Hub, Solar, Kenley House Generation Hub Direct primaryAccepted150 MW
- Chuch Farm Solar Energy CentreChurch Farm Solar Energy Centre, Solar, Church Farm primaryAccepted75 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose