QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Broken Scar Treatment Works

Broken Scar WTW at Norton

Northern Powergrid Embedded Capacity Register 1MW and Over, April 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
23 May 2024
Status
Connected
Customer
Broken Scar WTW
Site name
Broken Scar Treatment Works
Address
Broken Scar Treatment Works, Coniscliffe Road, Darlington, County Durham, DL3 8TF
Grid reference
Easting 425519, northing 514189
Licence area
North East (Northern Powergrid)
Grid supply point
Norton
Bulk supply point
Darlington Central
Primary substation
Darlington 33/11kV
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 3.4 MW registered
Registered capacity
3.4 MW
Maximum export capacity
3.4 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
12 Aug 2021
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
30 Apr 2025
Tracked since
April 2026 edition

Change history

Found in the April 2026 edition only.

Another record at this location is on a separate page.

Changes to its status, capacity, technology or customer, newest first.

  • May 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at Norton

GSP view

67 other sites at this grid supply point in the September 2026 edition, 1 of them at Darlington 33/11kV, the same primary substation. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.

See all 67

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose