Alsing Road
Blackburn Meadows Biomass Power Station at West Melton / Thorpe Marsh
Northern Powergrid Embedded Capacity Register 1MW and Over, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Jul 2013
- Status
- Connected
- Customer
- Blackburn Meadows Biomass Power Station
- Site name
- Alsing Road
- Address
- Alsing Road, Tinsley, Sheffield, South Yorkshire, S9 1HF
- Grid reference
- Easting 439452, northing 391621
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- West Melton / Thorpe Marsh
- Bulk supply point
- Blackburn Meadows B
- Primary substation
- Alsing Road
- Connection voltage
- 33 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biomass, Steam turbine (thermal power plant): 3.2 MW registered
- Registered capacity
- 3.2 MW
- Maximum export capacity
- 3.2 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 2394000099056
- Import MPAN
- 2394000099065
- Last updated
- 7 Oct 2025
- Tracked since
- August 2026 edition
Change history
Found in the August 2026 edition only.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
- September 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at West Melton / Thorpe Marsh
GSP view49 other sites at this grid supply point in the September 2026 edition, 2 of them at Alsing Road, the same primary substation. In all, the sites here total 1.3 GW: 0.3 GW connected, 1 GW accepted to connect.
- Alsing RoadBlackburn Meadows Biomass Power Station, Bioenergy and waste, Alsing Road primaryConnected3.2 MW
- West Melton Station PVWest Melton Station PV, Solar, West Melton Station PV Direct primaryAccepted120 MW
- Holme Wood Lane Solar and BESSNew Holme Wood Lane Solar and BESS, Solar, New Holme Wood Lane Solar & BESS primaryAccepted84 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose