QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Aldbrough Road

Withernwick Wind Farm at Creyke Beck

Northern Powergrid Embedded Capacity Register 1MW and Over, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
6 Mar 2013
Status
Connected
Customer
Withernwick Wind Farm
Site name
Aldbrough Road
Address
Aldbrough Road, Aldbrough, Hull, North Yorkshire, HU11 4TX
Grid reference
Easting 519592, northing 441399
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Creyke Beck
Bulk supply point
Driffield/Beverley Group
Primary substation
Withernwick Windfarm
Connection voltage
66 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 18.07 MW registered
Registered capacity
18.07 MW
Maximum export capacity
18.07 MW
Maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394000098805
Import MPAN
Not stated
Last updated
8 Mar 2017
Tracked since
August 2026 edition

Change history

Found in the August 2026 edition only.

Another record at this location is on a separate page.

Changes to its status, capacity, technology or customer, newest first.

  • September 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at Creyke Beck

GSP view

69 other sites at this grid supply point in the September 2026 edition, 2 of them at Withernwick Windfarm, the same primary substation. In all, the sites here total 1.9 GW: 0.6 GW connected, 1.3 GW accepted to connect.

See all 69

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose