QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

ABP, East Parade

ABP, East Parade at Camblesforth

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
6 Nov 2019
Status
Connected
Customer
ABP, East Parade
Site name
ABP, East Parade
Address
ABP, East Parade, Goole, North Yorkshire, DN14 5RB
Grid reference
Easting 474791, northing 423527
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Camblesforth
Bulk supply point
Camblesforth
Primary substation
Goole
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 1.147 MW registered
Registered capacity
1.147 MW
Maximum export capacity
1.147 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
6 Oct 2017
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
7 Nov 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Camblesforth

GSP view

15 other sites at this grid supply point in the November 2026 edition, 1 of them at Goole, the same primary substation. In all, the sites here total 553 MW: 173 MW connected, 380 MW accepted to connect.

See all 15

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?