Wigmoor farm landfill stoke orchard road, bishops cleeve cheltenham
Grundon waste management ltd at Port Ham 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 17 Aug 2022
- Status
- Connected
- Customer
- Grundon waste management ltd
- Site name
- Wigmoor farm landfill stoke orchard road, bishops cleeve cheltenham
- Address
- Grundon Waste Management Limited Cleeve Quarry, Wingmoor Farm, Stoke Orchard Road, Bishops Cleeve, Cheltenham, Gloucestershire, GL52 7DG
- Grid reference
- Easting 394525, northing 227599
- Licence area
- West Midlands
- Grid supply point
- Port Ham 132Kv S Stn
- Bulk supply point
- Cheltenham 66Kv S Stn
- Primary substation
- Bishops Cleeve 66 11Kv S Stn
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Landfill gas, Gas turbine (OCGT): 1.2 MW registered
- Registered capacity
- 1.2 MW
- Maximum export capacity
- 1.14 MW
- Maximum import capacity
- 0.401 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1460001526998
- Import MPAN
- 1460001527004
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Port Ham 132Kv S Stn
GSP view45 other sites at this grid supply point in the August 2026 edition, 3 of them at Bishops Cleeve 66 11Kv S Stn, the same primary substation. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.
- Wingmoor farm,stoke orchard,bishops cleeve,cheltenham gl52 7dgSevern trent green power (andigestion) limited, Gas and other fossil, Bishops Cleeve 66 11Kv S Stn primaryConnected2.268 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?