Volkswagen group
Volkswagen group uk limited at Lea Marston 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 May 2014
- Status
- Connected
- Customer
- Volkswagen group uk limited
- Site name
- Volkswagen group
- Address
- T N T Logistics Centre, Watling Street, Dordon, Tamworth, Warwickshire, B78 1SY
- Grid reference
- Easting 425970, northing 300129
- Licence area
- East Midlands
- Grid supply point
- Lea Marston 132Kv S Stn
- Bulk supply point
- Tamworth 33Kv S Stn
- Primary substation
- Birch Coppice 33 11Kv S Stn
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 1.5 MW registered
- Registered capacity
- 1.5 MW
- Maximum export capacity
- 1.425 MW
- Maximum import capacity
- 1.9 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1170000323133
- Import MPAN
- 1100051050549
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Lea Marston 132Kv S Stn
GSP view27 other sites at this grid supply point in the August 2026 edition, 1 of them at Birch Coppice 33 11Kv S Stn, the same primary substation. In all, the sites here total 736 MW: 90 MW connected, 646 MW accepted to connect.
- Dordon, birch coppice business parkOcado operating limited, Bioenergy and waste, Birch Coppice 33 11Kv S Stn primaryConnected2.676 MW
- Haunton manor farm solarHaunton farmers solar limited, Solar, Tamworth Town 11Kv S Stn primaryConnected49.28 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?