Vigo utopia landfill generating site
Cory environmental (central) limited at Bustleholm 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Jan 2006
- Status
- Connected
- Customer
- Cory environmental (central) limited
- Site name
- Vigo utopia landfill generating site
- Address
- Export Enovert North Limited, Coppice Lane, Walsall wood, WS9 8TB
- Grid reference
- Easting 404813, northing 302107
- Licence area
- West Midlands
- Grid supply point
- Bustleholm 132Kv S Stn
- Bulk supply point
- Rushall 132Kv S Stn
- Primary substation
- Rushall 132/11Kv
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Landfill gas, Gas turbine (OCGT): 2.1 MW registered
- Registered capacity
- 2.1 MW
- Maximum export capacity
- 1.995 MW
- Maximum import capacity
- 0.076 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1460001443384
- Import MPAN
- 1460001443375
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Bustleholm 132Kv S Stn
GSP view7 other sites at this grid supply point in the August 2026 edition, 1 of them at Rushall 132/11Kv, the same primary substation. In all, the sites here total 108 MW: 9 MW connected, 99 MW accepted to connect.
- Highfields south landfill siteCory environmental (central) limited, Bioenergy and waste, Rushall 132/11Kv primaryConnected2.2 MW
- Broad streetInternational convention centre & national indoor arena, Other or not stated, Ladywood 132/11Kv primaryConnected1.6 MW
- Summerfield hospitalDudley rd hosp export, Other or not stated, Winson Green 132/11Kv primaryConnected1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?