Land at walsall, full grid app
chapel lane energy storage limited at Bustleholm 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 10 Feb 2027
- Status
- Accepted to connect
- Customer
- chapel lane energy storage limited
- Site name
- Land at walsall, full grid app
- Address
- Chapel Lane, Walsall, WS9 0QU
- Grid reference
- Easting 4080326185, northing 3006097305
- Licence area
- West Midlands
- Grid supply point
- Bustleholm 132Kv S Stn
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 49.35 MW registered
- Registered capacity
- 49.35 MW
- Change to maximum export capacity
- 49.35 MW
- Change to maximum import capacity
- 49.35 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- 2 Aug 2021
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Bustleholm 132Kv S Stn
GSP view7 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 108 MW: 9 MW connected, 99 MW accepted to connect.
- Highfields south landfill siteCory environmental (central) limited, Bioenergy and waste, Rushall 132/11Kv primaryConnected2.2 MW
- Vigo utopia landfill generating siteCory environmental (central) limited, Bioenergy and waste, Rushall 132/11Kv primaryConnected2.1 MW
- Broad streetInternational convention centre & national indoor arena, Other or not stated, Ladywood 132/11Kv primaryConnected1.6 MW
- Summerfield hospitalDudley rd hosp export, Other or not stated, Winson Green 132/11Kv primaryConnected1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?