Thornton lane solar farm

Thornton lane solar farm limited at Enderby 132Kv S Stn

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
22 Mar 2016
Status
Connected
Planning consent
Granted 8 Sep 2015
Hinckley and Bosworth, reference 15/00645/FUL · Source: REPD
Customer
Thornton lane solar farm limited
Site name
Thornton lane solar farm
Address
Trornton Lane, Stanton Under Bardon, Markfield, Leicestershire, LE67 9TU
Grid reference
Easting 446765, northing 309661
Licence area
East Midlands
Grid supply point
Enderby 132Kv S Stn
Bulk supply point
Coalville 33Kv S Stn
Primary substation
Coalville 11Kv S Stn
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 2.75 MW registered
Registered capacity
2.75 MW
Maximum export capacity
2.613 MW
Maximum import capacity
0.095 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1170000616640
Import MPAN
1170000616455
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Enderby 132Kv S Stn

GSP view

35 other sites at this grid supply point in the August 2026 edition, 1 of them at Coalville 11Kv S Stn, the same primary substation. In all, the sites here total 577 MW: 197 MW connected, 380 MW accepted to connect.

See all 35

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.