Stockton heaths of stockton
Heaths of stockton at Ironbridge 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Aug 2015
- Status
- Connected
- Customer
- Heaths of stockton
- Site name
- Stockton heaths of stockton
- Address
- Stockton Grange Farm, Stockton House Junction To Stockton Gran, Stockton, Newport, TF10 9BA
- Grid reference
- Easting 377070, northing 316886
- Licence area
- West Midlands
- Grid supply point
- Ironbridge 132Kv S Stn
- Bulk supply point
- Ketley 132Kv S Stn
- Primary substation
- Newport 33 11Kv S Stn
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Landfill gas, Gas turbine (OCGT): 1.55 MW registered
- Registered capacity
- 1.55 MW
- Maximum export capacity
- 1.473 MW
- Maximum import capacity
- 0.143 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1470000423843
- Import MPAN
- 1470000423852
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Ironbridge 132Kv S Stn
GSP view26 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 371 MW: 92 MW connected, 279 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?