Station farm

Staples vegetables ltd at Walpole 132Kv S Stn

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
9 Mar 2013
Status
Connected
Customer
Staples vegetables ltd
Site name
Station farm
Address
Export Staples Vegetables Limited, Station Farm, Station Road, Sibsey, Boston, Lincolnshire, PE22 0SE
Grid reference
Easting 536547, northing 350455
Licence area
East Midlands
Grid supply point
Walpole 132Kv S Stn
Bulk supply point
Boston 33Kv S Stn
Primary substation
Stickney 33 11Kv S Stn
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
Biomass, Steam turbine (thermal power plant): 0.8 MW registered
Registered capacity
0.8 MW
Maximum export capacity
1.14 MW
Maximum import capacity
0.95 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1170000111358
Import MPAN
1170000119923
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Walpole 132Kv S Stn

GSP view

45 other sites at this grid supply point in the August 2026 edition, 4 of them at Stickney 33 11Kv S Stn, the same primary substation. In all, the sites here total 794 MW: 279 MW connected, 515 MW accepted to connect.

See all 45

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?