Foldhill foods limited
Beba energy uk ltd at Walpole 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 6 Nov 2026
- Status
- Accepted to connect
- Customer
- Beba energy uk ltd
- Site name
- Foldhill foods limited
- Address
- Lade Bank, Old Leake, Boston, Lincolnshire, PE22 9RJ
- Grid reference
- Easting 5397940, northing 3540710
- Licence area
- East Midlands
- Grid supply point
- Walpole 132Kv S Stn
- Bulk supply point
- Boston 33Kv S Stn
- Primary substation
- Stickney 33 11Kv S Stn
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 1.45 MW registered
- Registered capacity
- 1.45 MW
- Change to maximum export capacity
- 1.05 MW
- Change to maximum import capacity
- 1.5 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- 19 Dec 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Walpole 132Kv S Stn
GSP view45 other sites at this grid supply point in the August 2026 edition, 4 of them at Stickney 33 11Kv S Stn, the same primary substation. In all, the sites here total 794 MW: 279 MW connected, 515 MW accepted to connect.
- A d plant beeches laneBeeswax dyson farming ltd, Bioenergy and waste, Stickney 33 11Kv S Stn primaryConnected3 MW
- Station farmStaples vegetables ltd, Bioenergy and waste, Stickney 33 11Kv S Stn primaryConnected0.8 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose