Saltash,north wayton farm
Ks spv 21 limited at Landulph Sgp
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 24 Mar 2014
- Status
- Connected
- Planning consent
- Granted 9 Apr 2013
Cornwall, reference PA12/09275 · Source: REPD - Customer
- Ks spv 21 limited
- Site name
- Saltash,north wayton farm
- Address
- North Wayton Farmhouse, Landulph, Saltash, Cornwall, PL12 6QQ
- Grid reference
- Easting 241945, northing 63221
- Licence area
- South West
- Grid supply point
- Landulph Sgp
- Bulk supply point
- Landulph Bsp
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 6.67 MW registered
- Registered capacity
- 6.67 MW
- Maximum export capacity
- 6.337 MW
- Maximum import capacity
- 0.086 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2200042323137
- Import MPAN
- 2200042323128
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Landulph Sgp
GSP view39 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 644 MW: 255 MW connected, 389 MW accepted to connect.
- Plymouth devonport royal dockyard north/central intakeDevonport royal dockyard limited, Gas and other fossil, North Intake primaryConnected82 MW
- Ellbridge farm, landulph energy storage plantConrad energy (developments) ii ltd, StorageAccepted49.9 MW
- Plymouth energy park stor 1 (former toshiba factory) ernesettle laneIre 001 ltd, StorageConnected27.6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.