Queensway campus, , denso manufacturing uk limited

Olympus power ltd at Ironbridge 132Kv S Stn

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
22 Aug 2026
Status
Accepted to connect
Customer
Olympus power ltd
Site name
Queensway campus, , denso manufacturing uk limited
Address
Telford, Shropshire, TF1 7FS
Grid reference
Easting 3678560, northing 3130890
Licence area
West Midlands
Grid supply point
Ironbridge 132Kv S Stn
Bulk supply point
Ironbridge 400/132Kv
Primary substation
Hortonwood 132 11Kv S Stn
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
Advanced Fuel (produced via gasification or pyrolysis of biofuel or waste), Engine (combustion / reciprocating): 2.001 MW registered
Energy source 2
Solar, Photovoltaic: 0.49 MW registered
Registered capacity
2.491 MW
Change to maximum export capacity
0.49 MW
Change to maximum import capacity
6 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
7 May 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Ironbridge 132Kv S Stn

GSP view

26 other sites at this grid supply point in the August 2026 edition, 2 of them at Hortonwood 132 11Kv S Stn, the same primary substation. In all, the sites here total 371 MW: 92 MW connected, 279 MW accepted to connect.

See all 26

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose