Pontyclun larigan power
Larigan power limited at Upper Boat
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 27 May 2016
- Status
- Connected
- Customer
- Larigan power limited
- Site name
- Pontyclun larigan power
- Address
- Unit B1-B3, Coedcae Lane Industrial Estate, Coedcae Lane, Pontyclun, Mid Glamorgan, CF72 9HG
- Grid reference
- Easting 302952, northing 182310
- Licence area
- South Wales
- Grid supply point
- Upper Boat
- Bulk supply point
- Pontyclun Primary
- Primary substation
- Pontyclun 132/11Kv
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 22.72 MW registered
- Registered capacity
- 22.72 MW
- Maximum export capacity
- 15.998 MW
- Maximum import capacity
- 0.57 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2100041328733
- Import MPAN
- 2100041328715
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Upper Boat
GSP view38 other sites at this grid supply point in the August 2026 edition, 3 of them at Pontyclun 132/11Kv, the same primary substation. In all, the sites here total 597 MW: 249 MW connected, 348 MW accepted to connect.
- Pontyclun larigan powerLarigan power limited, Gas and other fossil, Pontyclun 132/11Kv primaryConnected22.72 MW
- Trecastle solar farmTrecastle renewables limited, Solar, Pontyclun 132/11Kv primaryConnected3.996 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?