Pencoed stor
Centrica distributed generation limited at Upper Boat
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Jun 2026
- Status
- Connected
- Customer
- Centrica distributed generation limited
- Site name
- Pencoed stor
- Address
- Diesel/Biodiesel Engine, Pencoed, Felindre Road,, Pencoed, CF35 5HU
- Grid reference
- Easting 2967410000000000, northing 1819078
- Licence area
- South Wales
- Grid supply point
- Upper Boat
- Bulk supply point
- Upper Boat Bsp
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Other, Engine (combustion / reciprocating): 40.491 MW registered
- Registered capacity
- 40.491 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- 1.202 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2100042063386
- Import MPAN
- 2100042063039
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Upper Boat
GSP view38 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 597 MW: 249 MW connected, 348 MW accepted to connect.
- Pontyclun larigan powerLarigan power limited, Gas and other fossil, Pontyclun 132/11Kv primaryConnected22.72 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?