Plymouth - becton dickinson no 2
Becton dickinson uk limited at Landulph Sgp
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 4 Oct 2023
- Status
- Connected
- Customer
- Becton dickinson uk limited
- Site name
- Plymouth - becton dickinson no 2
- Address
- Chp, Belliver Way, Roborough, Plymouth, Devon, PL6 7BP
- Grid reference
- Easting 249783, northing 62176
- Licence area
- South West
- Grid supply point
- Landulph Sgp
- Bulk supply point
- Ernesettle Bsp
- Primary substation
- Southway
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 2 MW registered
- Registered capacity
- 2 MW
- Maximum export capacity
- 0.713 MW
- Maximum import capacity
- 6.65 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2200043661443
- Import MPAN
- 2200042816656
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Landulph Sgp
GSP view39 other sites at this grid supply point in the August 2026 edition, 3 of them at Southway, the same primary substation. In all, the sites here total 644 MW: 255 MW connected, 389 MW accepted to connect.
- Plymouth belliver wayBecton dickinson uk limited, Gas and other fossil, Southway primaryConnected2 MW
- Plymouth devonport royal dockyard north/central intakeDevonport royal dockyard limited, Gas and other fossil, North Intake primaryConnected82 MW
- Ellbridge farm, landulph energy storage plantConrad energy (developments) ii ltd, StorageAccepted49.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?