Plump hill, locquiers farm
opdenergy uk 3 limited at Port Ham 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Sep 2027
- Status
- Accepted to connect
- Planning consent
- Granted 15 Dec 2021
Forest of Dean, reference P0980/21/FUL · Source: REPD - Contract for Difference
- Allocation Round 5
- Customer
- opdenergy uk 3 limited
- Site name
- Plump hill, locquiers farm
- Address
- Forest Of Dean, Gloucestershire, GL17 0HQ
- Grid reference
- Easting 365461873, northing 217152052
- Licence area
- West Midlands
- Grid supply point
- Port Ham 132Kv S Stn
- Bulk supply point
- Lydney 33Kv S Stn
- Primary substation
- Mitcheldean 33 11Kv S Stn
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 12 MW registered
- Registered capacity
- 12 MW
- Change to maximum export capacity
- 12 MW
- Change to maximum import capacity
- 0.3 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- 26 Feb 2021
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Port Ham 132Kv S Stn
GSP view45 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.
Contract for Difference
The Contracts for Difference allocation round for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition. QueueWatch matched the site to that record.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.