Newton abbot stover (trago mills)

Trago mills (s devon) limited at Abham Sgp

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Dec 2012
Status
Connected
Customer
Trago mills (s devon) limited
Site name
Newton abbot stover (trago mills)
Address
Trago Mills, Road Past Trago Mills, Liverton, Devon, TQ12 6JD
Grid reference
Easting 282048, northing 74367
Licence area
South West
Grid supply point
Abham Sgp
Bulk supply point
Totnes Bsp
Primary substation
Ashburton
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 0.816 MW registered
Energy source 2
Fossil - Oil, Engine (combustion / reciprocating): 0.76 MW registered
Energy source 3
0.599 MW registered
Registered capacity
2.175 MW
Maximum export capacity
0.764 MW
Maximum import capacity
0.808 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
2200042190691
Import MPAN
2200030360478
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Abham Sgp

GSP view

50 other sites at this grid supply point in the August 2026 edition, 1 of them at Ashburton, the same primary substation. In all, the sites here total 613 MW: 178 MW connected, 435 MW accepted to connect.

See all 50

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?