Merthyr tydfil pengarnddu industrial estate

St merryn meat limited at Upper Boat

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
7 Sep 2019
Status
Connected
Customer
St merryn meat limited
Site name
Merthyr tydfil pengarnddu industrial estate
Address
St Merryn Meat Limited Export, Penygarnddu Industrial Estate, Dowlais, Merthyr tydfil, Mid Glamorgan, CF48 2TA
Grid reference
Easting 308073, northing 208731
Licence area
South Wales
Grid supply point
Upper Boat
Bulk supply point
Merthyr East Grid
Primary substation
Merthyr East Primary
Connection voltage
11 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 1.5 MW registered
Registered capacity
1.5 MW
Maximum export capacity
1.52 MW
Maximum import capacity
4.75 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
2100041483128
Import MPAN
2198765386413
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Upper Boat

GSP view

38 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 597 MW: 249 MW connected, 348 MW accepted to connect.

See all 38

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose