Land near
Boultbee brooks (renewables county) at Bushbury D 132Kv
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 1 Feb 2028
- Status
- Accepted to connect
- Customer
- Boultbee brooks (renewables county)
- Site name
- Land near
- Address
- County Lane, Albrighton, Wolverhampton, WV7 3AH
- Grid reference
- Easting 3835470000000000, northing 3033210000000000
- Licence area
- West Midlands
- Grid supply point
- Bushbury D 132Kv
- Bulk supply point
- Bushbury C 132Kv S Stn
- Primary substation
- Albrighton 33 11Kv S Stn
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 9 MW registered
- Registered capacity
- 9 MW
- Change to maximum export capacity
- 9 MW
- Change to maximum import capacity
- 0.001 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- 18 Aug 2020
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Bushbury D 132Kv
GSP view22 other sites at this grid supply point in the August 2026 edition, 1 of them at Albrighton 33 11Kv S Stn, the same primary substation. In all, the sites here total 564 MW: 106 MW connected, 458 MW accepted to connect.
- Harriet hayes solar farmAlbrighton solar farm ltd, Solar, Albrighton 33 11Kv S Stn primaryConnected4.08 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose