Land adj brookthorpe court
Padero solar ltd at Port Ham 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 1 Oct 2026
- Status
- Accepted to connect
- Customer
- Padero solar ltd
- Site name
- Land adj brookthorpe court
- Address
- Stroud Road, Gloucester, GL4 OUT
- Grid reference
- Not stated
- Licence area
- West Midlands
- Grid supply point
- Port Ham 132Kv S Stn
- Bulk supply point
- Castle Meads 33Kv S Stn
- Primary substation
- Tuffley 33 11Kv S Stn
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 8 MW registered
- Registered capacity
- 8 MW
- Change to maximum export capacity
- 8 MW
- Change to maximum import capacity
- 0.055 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- 19 Apr 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Port Ham 132Kv S Stn
GSP view45 other sites at this grid supply point in the August 2026 edition, 4 of them at Tuffley 33 11Kv S Stn, the same primary substation. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.
- Uk capacity reserve ltdUk capacity reserve limited, Gas and other fossil, Tuffley 33 11Kv S Stn primaryConnected20 MW
- Netheridge water treatment worksSevern trent water limited, Bioenergy and waste, Tuffley 33 11Kv S Stn primaryConnected6.668 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose