Glen lyn generations lynmouth
Glen lyn generations ltd at Alverdiscott Sgp
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Apr 2018
- Status
- Connected
- Customer
- Glen lyn generations ltd
- Site name
- Glen lyn generations lynmouth
- Address
- Export, Glen Lyn Gorge, Lynmouth, Devon, EX35 6ER
- Grid reference
- Easting 272367, northing 149277
- Licence area
- South West
- Grid supply point
- Alverdiscott Sgp
- Bulk supply point
- Barnstaple Bsp
- Primary substation
- Lynton
- Connection voltage
- 11 kV
- Technology group
- Hydro and marine
- Energy source 1
- Water (flowing water or head of water), Hydro - Run of river: 0.7 MW registered
- Energy source 2
- 0.6 MW registered
- Registered capacity
- 1.3 MW
- Maximum export capacity
- 1.33 MW
- Maximum import capacity
- 0.048 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2200042852343
- Import MPAN
- 2200042852334
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Alverdiscott Sgp
GSP view79 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 1.4 GW: 0.5 GW connected, 0.9 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose