Devon green power

Devon green power ltd at Exeter Main Sgp

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
24 Sep 2026
Status
Accepted to connect
Customer
Devon green power ltd
Site name
Devon green power
Address
Hide Market Road, Cullompton, Devon, EX15 2QE
Grid reference
Easting 303038, northing 111372
NGED’s register gives it in tenths of a metre.
Licence area
South West
Grid supply point
Exeter Main Sgp
Bulk supply point
Tiverton Bsp
Primary substation
Tiverton Junction
Connection voltage
0.4 kV
Technology group
Bioenergy and waste
Energy source 1
Biofuel - Biogas from anaerobic digestion (excluding landfill & sewage), Engine (combustion / reciprocating): 1 MW registered
Registered capacity
1 MW
Change to maximum export capacity
1 MW
Change to maximum import capacity
1.5 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
22 Jun 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Exeter Main Sgp

GSP view

63 other sites at this grid supply point in the August 2026 edition, 5 of them at Tiverton Junction, the same primary substation. In all, the sites here total 1.1 GW: 0.2 GW connected, 0.9 GW accepted to connect.

See all 63

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?