Chelson meadow landfill site

Communities for renewables cic at Abham Sgp

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
24 Feb 2027
Status
Accepted to connect
Planning consent
Granted 24 Jun 2022
Plymouth, reference 22/00219/FUL · Source: REPD
Customer
Communities for renewables cic
Site name
Chelson meadow landfill site
Address
The Ride, Plymouth, PL9 7JS
Grid reference
Easting 250801, northing 55167
NGED’s register gives it in tenths of a metre.
Licence area
South West
Grid supply point
Abham Sgp
Bulk supply point
Plymouth Bsp
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 10 MW registered
Registered capacity
10 MW
Change to maximum export capacity
10 MW
Change to maximum import capacity
0.1 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
9 Dec 2020
Date connected
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Abham Sgp

GSP view

50 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 613 MW: 178 MW connected, 435 MW accepted to connect.

See all 50

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.