Callington haye lane 33kv solar park haye farm
Callington solar park limited at Landulph Sgp
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 18 Dec 2013
- Status
- Connected
- Customer
- Callington solar park limited
- Site name
- Callington haye lane 33kv solar park haye farm
- Address
- Hope Farm, Haye Lane, Callington, Cornwall, PL17 7LG
- Grid reference
- Easting 234971, northing 70321
- Licence area
- South West
- Grid supply point
- Landulph Sgp
- Bulk supply point
- St Germans Bsp
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 5.25 MW registered
- Registered capacity
- 5.25 MW
- Maximum export capacity
- 4.988 MW
- Maximum import capacity
- 0.048 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2200042165064
- Import MPAN
- 2200042165055
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Landulph Sgp
GSP view39 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 644 MW: 255 MW connected, 389 MW accepted to connect.
- Plymouth devonport royal dockyard north/central intakeDevonport royal dockyard limited, Gas and other fossil, North Intake primaryConnected82 MW
- Ellbridge farm, landulph energy storage plantConrad energy (developments) ii ltd, StorageAccepted49.9 MW
- Plymouth energy park stor 1 (former toshiba factory) ernesettle laneIre 001 ltd, StorageConnected27.6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose