Bridgwater chilton trinity stw import/export site
Wessex water services ltd at Bridgwater Sgp
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Apr 2001
- Status
- Connected
- Customer
- Wessex water services ltd
- Site name
- Bridgwater chilton trinity stw import/export site
- Address
- Saltlands Recycling Centre Export, Saltlands Avenue, Bridgwater, Somerset, TA6 3JG
- Grid reference
- Easting 330111, northing 138280
- Licence area
- South West
- Grid supply point
- Bridgwater Sgp
- Bulk supply point
- Bridgwater Grid Bsp
- Primary substation
- Bath Road Primary
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Engine (combustion / reciprocating): 1.25 MW registered
- Registered capacity
- 1.25 MW
- Maximum export capacity
- 1.188 MW
- Maximum import capacity
- 0.789 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2200031824826
- Import MPAN
- 2200030354846
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Bridgwater Sgp
GSP view52 other sites at this grid supply point in the August 2026 edition, 6 of them at Bath Road Primary, the same primary substation. In all, the sites here total 620 MW: 189 MW connected, 431 MW accepted to connect.
- Bridgwater, gfe generating station, the droveConrad (drove) limited, Gas and other fossil, Bath Road Primary primaryConnected6.354 MW
- Bridgwater walpole landfill 2 exit point's import/export siteInfinis (re-gen) limited, Bioenergy and waste, Bath Road Primary primaryConnected4.932 MW
- Bridgwater walpole landfill 2 exit point's import/export siteInfinis (re-gen) limited, Bioenergy and waste, Bath Road Primary primaryConnected4.932 MW
- Bridgwater, viridor landfill, pawlettViridor waste management ltd, Bioenergy and waste, Bath Road Primary primaryConnected2.242 MW
- Summerway drove pv generator siteBridgewater solar limited, Solar, Bath Road Primary primaryConnected1.734 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose