Bridgend south cornelly services
Uk power reserve limited at Pyle Grid
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 12 Dec 2001
- Status
- Connected
- Customer
- Uk power reserve limited
- Site name
- Bridgend south cornelly services
- Address
- Uk Power Reserve South Cornelly Generation Station, South Cornelly Trading Estate, South Cornelly, Bridgend, Mid Glamorgan, CF33 4RE
- Grid reference
- Easting 282128, northing 180035
- Licence area
- South Wales
- Grid supply point
- Pyle Grid
- Bulk supply point
- Pyle Bsp
- Primary substation
- Not stated
- Connection voltage
- Not stated
- Technology group
- Other or not stated
- Energy source 1
- 12.51 MW registered
- Registered capacity
- 12.51 MW
- Maximum export capacity
- 9.12 MW
- Maximum import capacity
- 0.285 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2100040067477
- Import MPAN
- 2100040067486
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Pyle Grid
GSP view28 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 619 MW: 170 MW connected, 449 MW accepted to connect.
- Western wood biomass 2Margam green energy limited, Bioenergy and waste, Pyle Primary primaryConnected48.96 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose