QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Llynfi afan wind farm

Llynfi afan renewable energy park limited at Pyle Grid

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Mar 2017
Status
Connected
Customer
Llynfi afan renewable energy park limited
Site name
Llynfi afan wind farm
Address
Llynfi Afan Wind Farm, Abergwynfi, Port talbot, West Glamorgan, SA13 3YN
Grid reference
Easting 288281, northing 193251
NGED’s register gives it in tenths of a metre.
Licence area
South Wales
Grid supply point
Pyle Grid
Bulk supply point
Pyle Bsp
Primary substation
Not stated
Connection voltage
66 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 24.84 MW registered
Registered capacity
24.84 MW
Maximum export capacity
23.997 MW
Maximum import capacity
0.238 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
2100041394114
Import MPAN
2100041394105
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Pyle Grid

GSP view

28 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 619 MW: 170 MW connected, 449 MW accepted to connect.

See all 28

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?