QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Barry biglis farm

Elm solar farms limited at Aberthaw Power Station

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
30 Mar 2016
Status
Connected
Planning consent
Granted 2 Oct 2015
Vale of Glamorgan, reference 2015/00573/FUL · Source: REPD
Customer
Elm solar farms limited
Site name
Barry biglis farm
Address
Biglis Solar Pv Installation, Argae Lane, Palmerstown, St andrews major, South Glamorgan, CF63 1BL
Grid reference
Easting 314068, northing 169805
Licence area
South Wales
Grid supply point
Aberthaw Power Station
Bulk supply point
Sully Grid
Primary substation
Sully Grid Primary
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 4.14 MW registered
Registered capacity
4.14 MW
Maximum export capacity
4.75 MW
Maximum import capacity
0.19 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
2100041357831
Import MPAN
2100041358560
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Aberthaw Power Station

GSP view

21 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 259 MW: 75 MW connected, 184 MW accepted to connect.

See all 21

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.