Ambition community energy wind turbine
Ambition community energy cic at Seabank Sgp
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 31 Jan 2023
- Status
- Connected
- Customer
- Ambition community energy cic
- Site name
- Ambition community energy wind turbine
- Address
- Ambition Community Energy Wind Turbine, Severn Road, Avonmouth, Bristol, BS11 0YL
- Grid reference
- Easting 353356, northing 182328
- Licence area
- South West
- Grid supply point
- Seabank Sgp
- Bulk supply point
- Avonmouth Bsp
- Primary substation
- Kingsweston
- Connection voltage
- 11 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 4.2 MW registered
- Registered capacity
- 4.2 MW
- Maximum export capacity
- 4.2 MW
- Maximum import capacity
- 0.148 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2200043373830
- Import MPAN
- 2200043484689
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Seabank Sgp
GSP view54 other sites at this grid supply point in the August 2026 edition, 4 of them at Kingsweston, the same primary substation. In all, the sites here total 696 MW: 214 MW connected, 482 MW accepted to connect.
- Bristol - wessex wind farm merebank rdTriodos renewables (severn) limited, Wind, Kingsweston primaryConnected8.2 MW
- Bristol accolade wines kings weston laneAccolade wines limited, Wind, Kingsweston primaryConnected2.5 MW
- Bristol clean earth wind turbine kings weston laneC e avonmouth turbine limited, Wind, Kingsweston primaryConnected2.5 MW
- Severnside energy recovery centreWest london energy recovery limited, Bioenergy and wasteConnected50.019 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?