Alkane energy uk ltd

Alkane energy uk ltd at Staythorpe C 132Kv S Stn

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Apr 2005
Status
Connected
Customer
Alkane energy uk ltd
Site name
Not stated
Address
Kirkby On Bain Landfill Site, West Drayton Avenue, Bevercotes, Bothamsall, Nottinghamshire, DN22 8DQ
Grid reference
Easting 469514, northing 374440
Licence area
East Midlands
Grid supply point
Staythorpe C 132Kv S Stn
Bulk supply point
Checkerhouse 33Kv S Stn
Primary substation
Bevercotes 33 11Kv S Stn
Connection voltage
0.4 kV
Technology group
Other or not stated
Energy source 1
5.35 MW registered
Registered capacity
5.35 MW
Maximum export capacity
5.083 MW
Maximum import capacity
0.19 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1100770996862
Import MPAN
1100770996064
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Staythorpe C 132Kv S Stn

GSP view

39 other sites at this grid supply point in the August 2026 edition, 1 of them at Bevercotes 33 11Kv S Stn, the same primary substation. In all, the sites here total 856 MW: 295 MW connected, 561 MW accepted to connect.

See all 39

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose