REAPS MOSS WIND FARM

REAPS MOSS LIMITED at PADIHAM GSP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Aug 2015
Status
Connected
Planning consent
Granted 14 Oct 2009
Rossendale, reference 2007/125 · Source: REPD
Customer
REAPS MOSS LIMITED
Site name
REAPS MOSS WIND FARM
Address
LIMERSGATE, BACUP ROAD, LIMERSGATE, BACUP ROAD, TODMORDEN, LANCASHIRE, OL14 7HT
Grid reference
Easting 389349, northing 422719
Licence area
North West England (ENWL)
Grid supply point
PADIHAM GSP
Bulk supply point
ROSSENDALE
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 10.737 MW registered
Registered capacity
10.737 MW
Maximum export capacity
10.2 MW
Maximum import capacity
0.038 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1640000478035
Import MPAN
1640000478026
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at PADIHAM GSP

GSP view

31 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 993 MW: 75 MW connected, 918 MW accepted to connect.

See all 31

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.