MAKERFIELD WAY DEPOT
SAS ENERGY - WIGAN COUNCIL at KEARSLEY 132 GSP
ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- SAS ENERGY - WIGAN COUNCIL
- Site name
- MAKERFIELD WAY DEPOT
- Address
- MAKERFIELD WAY, INCE IN MAKERFIELD, WIGAN, GREATER MANCHESTER, WN2 2ER
- Grid reference
- Easting 361100, northing 405500
- Licence area
- North West England (ENWL)
- Grid supply point
- KEARSLEY 132 GSP
- Bulk supply point
- ATHERTON
- Primary substation
- HINDLEY GREEN
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, STORAGE - ELECTROCHEMICAL (BATTERIES): 7 MW registered
- Registered capacity
- 1.269 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- 0 MW
- Change to maximum export capacity
- 7 MW
- Change to maximum import capacity
- 1.269 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- 2 Dec 2020
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Dec 2021
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at KEARSLEY 132 GSP
GSP view26 other sites at this grid supply point in the September 2026 edition, 1 of them at HINDLEY GREEN, the same primary substation. In all, the sites here total 246 MW: 151 MW connected, 95 MW accepted to connect.
- KIRKLESS LANDFILL SITEINFINIS ENERGY SERVICES LIMITED, Bioenergy and waste, HINDLEY GREEN primaryConnected1.075 MW
- AGECROFTELECTRICITY NORTH WEST (CONSTRUCTION & MAINTENANCE) LTD, Gas and other fossilConnected15.789 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose