KIRKLESS LANDFILL SITE
INFINIS ENERGY SERVICES LIMITED at KEARSLEY 132 GSP
ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 15 Dec 2004
- Status
- Connected
- Planning consent
- Granted 13 Jun 2000
Wigan · Source: REPD - Customer
- INFINIS ENERGY SERVICES LIMITED
- Site name
- KIRKLESS LANDFILL SITE
- Address
- MAKERFIELD WAY, MAKERFIELD WAY, WIGAN, GREATER MANCHESTER, WN2 2ER
- Grid reference
- Easting 361024, northing 406063
- Licence area
- North West England (ENWL)
- Grid supply point
- KEARSLEY 132 GSP
- Bulk supply point
- ATHERTON
- Primary substation
- HINDLEY GREEN
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- BIOFUEL - LANDFILL GAS, ENGINE (COMBUSTION / RECIPROCATING): 1.065 MW registered
- Energy source 2
- WIND, ONSHORE WIND TURBINES: 0.01 MW registered
- Registered capacity
- 1.075 MW
- Maximum export capacity
- 0.58 MW
- Maximum import capacity
- 0.143 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1620001583740
- Import MPAN
- 1620001583730
- Last updated
- 6 Dec 2021
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at KEARSLEY 132 GSP
GSP view26 other sites at this grid supply point in the October 2026 edition, 1 of them at HINDLEY GREEN, the same primary substation. In all, the sites here total 246 MW: 151 MW connected, 95 MW accepted to connect.
- AGECROFTELECTRICITY NORTH WEST (CONSTRUCTION & MAINTENANCE) LTD, Gas and other fossilConnected15.789 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.