Burnley C BESS

Conrad Energy (Developments)

ENWL Embedded Capacity Register 2 – 1MW and above, May 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
Conrad Energy (Developments)
Site name
Burnley C BESS
Address
Land behind Surteco UK Ltd, Widow Hill Road, Burnley, Lancashire, BB10 2TB
Grid reference
Easting 386194, northing 434138
Licence area
North West England (ENWL)
Grid supply point
Not stated
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
Not stated
Technology group
Other or not stated
Energy source 1
25.3 MW registered
Registered capacity
25.3 MW
Change to maximum export capacity
25.3 MW
Change to maximum import capacity
25.3 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
5 Sep 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
11 Oct 2023
Tracked since
May 2026 edition

Change history

Found in the May 2026 edition only.

Changes to the details QueueWatch tracks, newest first.

  • September 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?