QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Brackenburgh Estate

GreenPower (International) Ltd at HARKER

ENWL Embedded Capacity Register 2 – 1MW and above, May 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
GreenPower (International) Ltd
Site name
Brackenburgh Estate
Address
Calthwaite, Penrith, Carlisle, Cumbria, CA11 9AR
Grid reference
Easting 346418, northing 538583
Licence area
North West England (ENWL)
Grid supply point
HARKER
Bulk supply point
PENRITH
Primary substation
Not stated
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar PV, Photovoltaic: 9 MW registered
Registered capacity
9 MW
Change to maximum export capacity
9 MW
Change to maximum import capacity
0.45 MW
Flexible connection
No
In a connection queue
No
Date accepted
25 Apr 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
11 May 2023
Tracked since
May 2026 edition

Change history

Found in the May 2026 edition only.

Changes to its status, capacity, technology or customer, newest first.

  • September 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at HARKER

GSP view

8 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 489 MW: 489 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose