QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

ROOSECOTE LDES POWER STATION

ROADNIGHT TAYLOR LTD at HARKER

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
ROADNIGHT TAYLOR LTD
Site name
ROOSECOTE LDES POWER STATION
Address
RAMPSIDE ROAD, BARROW IN FURNESS, CUMBRIA, LA13 0PQ
Grid reference
Easting 322288, northing 468359
Licence area
North West England (ENWL)
Grid supply point
HARKER
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Storage
Energy source 1
BATTERY STORAGE, BESS: 50 MW registered
Registered capacity
50 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
50 MW
Change to maximum import capacity
50 MW
Flexible connection
Not stated
In a connection queue
Not stated
Date accepted
27 Feb 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Feb 2026
Tracked since
May 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at HARKER

GSP view

7 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 489 MW: 489 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?