SCOTTISHPOWER RENEWABLES (UK) LTD
Customer named in the DNOs’ registers
In NGED’s August 2026 and SSEN’s November 2026 editions
The registers spell this customer’s name more than one way: “SCOTTISHPOWER RENEWABLES (UK) LTD” (1 site) and “scottishpower renewables (uk) limited” (1 site).
Capacity by DNO
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Solar | 2 | 83.3 MW | – | 83.3 MW |
Each site is grouped by its first energy source, as the register names it.
Sites
Each site under this name in the DNOs’ latest editions, the largest first.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Site | DNO | Grid supply point | Technology | Status | MW |
|---|---|---|---|---|---|
| Site at | NGED | Grendon 132Kv S Stn | Solar | Accepted to connect | 60 |
| BALLOCHY SOLAR FARM | SSEN | BRIDGE OF DUN | Solar | Accepted to connect | 23.308 |
Grid supply points
Each grid supply point its sites are at, with the capacity of its own sites there.
| Grid supply point | DNO | Sites | Connected | Accepted to connect |
|---|---|---|---|---|
| Grendon 132Kv S Stn | NGED | 1 | – | 60 MW |
| BRIDGE OF DUN | SSEN | 1 | – | 23.3 MW |
What changed recently
Changes to its sites found in both editions of each pair, newest first.
Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.
SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 1 site matched. Every October site and every November site had a match in the other edition.
No change to any detail QueueWatch tracks for its sites so far.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?