WEST BURTON B LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| West Burton B | West Burton 400kV Substation | Thermal (gas, biomass, waste) | 548 | 30 Oct 2027 | Not stated | Built |
Recent changes
- West Burton BEngland and Wales, Thermal (gas, biomass, waste)Stage removed (0 MW from 30 Oct 2033)
- West Burton BEngland and Wales, Thermal (gas, biomass, waste)New stage added (0 MW from 30 Oct 2033)
- West Burton BEngland and Wales, Thermal (gas, biomass, waste)Restructured from 1 stage (1,333 MW connected + 500 MW from 31 Oct 2032) to 2 stages (1,333 MW connected + 500 MW from 30 Oct 2027, 48 MW from 30 Oct 2034). First connection date −60 months−60 mo
- West Burton BEngland and Wales, Thermal (gas, biomass, waste)Status changed from Scoping to Built
- West Burton BEngland and Wales, Thermal (gas, biomass, waste)Capacity changed from 0 MW to 500 MW
- West Burton BEngland and Wales, Thermal (gas, biomass, waste)Connection date set to 31 Oct 2032
- West Burton BEngland and Wales, Thermal (gas, biomass, waste)Status changed from Built to Scoping
- West Burton BEngland and Wales, Thermal (gas, biomass, waste)Substation name updated in the register (from West Burton 400kV to West Burton 400kV Substation)
- West Burton BEngland and Wales, Thermal (gas, biomass, waste)Customer changed from EDF ENERGY (THERMAL GENERATION) LIMITED to WEST BURTON B LIMITED
- West Burton BEngland and Wales, Thermal (gas, biomass, waste)Technology changed from Gas (CCGT) to Gas (CCGT), Storage
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?