SSE STAYTHORPE POWER LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Staythorpe (BESS and PV) | Staythorpe 400kV Substation | Storage with solar or wind | 437 | 29 Sep 2028 | Not stated | Consents Approved |
Recent changes
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windStatus changed from Awaiting Consents to Consents Approved
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windRestructured from 1 stage (437 MW from 28 Sep 2028) to 1 stage (437 MW from 29 Sep 2028)
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windConnection date moved from 29 May 2026 to 28 Sep 2028 (+28 months)+28 mo
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windRenamed from Staythorpe
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windConnection date moved from 31 Aug 2024 to 29 May 2026 (+21 months)+21 mo
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windCustomer changed from Staythorpe Power Limited to SSE STAYTHORPE POWER LIMITED
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windCustomer changed from GRIDMOVE LTD to Staythorpe Power Limited
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windConnection point changed from Staythorpe (Network Rail) GSP to Staythorpe 400kV Substation
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windStatus changed from Scoping to Awaiting Consents
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windTechnology changed from Demand, Storage, Solar, Reactive compensation to Storage, Solar
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windConnection point changed from Staythorpe to Staythorpe (Network Rail) GSP
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windTechnology changed from Solar to Demand, Storage, Solar, Reactive compensation
- Staythorpe (BESS and PV)England and Wales, Storage with solar or windAdded to the registerNew
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?