IRON ACTON GREEN LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Iron Acton | 132kV bay at Iron Acton Substation | Storage with solar or wind | 20.6 | 30 Sep 2026 Past date | Gate 2 | Consents Approved |
Recent changes
- Iron ActonEngland and Wales, Storage with solar or windStage 2: Status changed from Under Construction/Commissioning to Consents Approved
- Iron ActonEngland and Wales, Storage with solar or windStage 2: Given a Gate 2 connection offerGate 2
- Iron ActonEngland and Wales, Storage with solar or windStage 2: Status changed from Scoping to Under Construction/Commissioning
- Iron ActonEngland and Wales, Storage with solar or windConnection point changed from Iron Acton - (South West) GSP to 132kV bay at Iron Acton Substation
- Iron ActonEngland and Wales, Storage with solar or windConnection point changed from Iron Acton 275kV Substation to Iron Acton - (South West) GSP
- Iron ActonEngland and Wales, Storage with solar or windConnection date moved from 30 Sep 2027 to 30 Sep 2026 (−12 months)−12 mo
- Iron ActonEngland and Wales, Storage with solar or windConnected MW moved between stages in the register (99.4 MW connected, unchanged)
- Iron ActonEngland and Wales, Storage with solar or windStage removed (49.5 MW connected)
- Iron ActonEngland and Wales, Storage with solar or windStage 2: 49.5 MW now connectedConnected
- Iron ActonEngland and Wales, Storage with solar or windStage 2: Status changed from Scoping to Built
- Iron ActonEngland and Wales, Storage with solar or windStage 2: Capacity changed from 49.9 MW to 49.5 MW
- Iron ActonEngland and Wales, Storage with solar or windStage 2: Connection date moved from 31 Jul 2023 to 30 Sep 2024 (+14 months)+14 mo
- Iron ActonEngland and Wales, Storage with solar or windStage 3: Capacity changed from 20.2 MW to 20.6 MW
- Iron ActonEngland and Wales, Storage with solar or windStage 3: Connection date moved from 31 Oct 2023 to 30 Sep 2027 (+47 months)+47 mo
- Iron ActonEngland and Wales, Storage with solar or windStage 1: 49.9 MW now connectedConnected
- Iron ActonEngland and Wales, Storage with solar or windStage 1: Connection date removed (was 31 Jul 2022)
- Iron ActonEngland and Wales, Storage with solar or windStage 1: Status changed from Scoping to Built
- Iron ActonEngland and Wales, Storage with solar or windStage 1: Technology changed from Hybrid to Storage, Solar
- Iron ActonEngland and Wales, Storage with solar or windStage 2: Technology changed from Hybrid to Storage, Solar
- Iron ActonEngland and Wales, Storage with solar or windStage 3: Technology changed from Hybrid to Storage, Solar
- Iron ActonEngland and Wales, Storage with solar or windSubstation name updated in the register (from Iron Acton GSP to Iron Acton 275kV Substation)
- Iron ActonEngland and Wales, Storage with solar or windStage 1: Technology changed from Storage, Solar to Hybrid
- Iron ActonEngland and Wales, Storage with solar or windStage 2: Technology changed from Storage, Solar to Hybrid
- Iron ActonEngland and Wales, Storage with solar or windStage 3: Technology changed from Storage, Solar to Hybrid
- Iron ActonEngland and Wales, Storage with solar or windSubstation name updated in the register (from Iron Acton to Iron Acton GSP)
- Iron ActonEngland and Wales, Storage with solar or windRestructured from 1 stage (120 MW from 30 Nov 2021) to 3 stages (49.9 MW from 31 Jul 2022, 49.9 MW from 31 Jul 2023, 20.2 MW from 31 Oct 2023). First connection date +8 months+8 mo
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?