FLEET SOLAR LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Fleet Solar PV | Fleet 400kV Substation | Solar | 57 | 7 Aug 2028 | Not stated | Awaiting Consents |
| Fleet Tertiary | Fleet 400kV Substation | Thermal (gas, biomass, waste) | 47.5 | 7 Aug 2028 +32 mo | Gate 1 | Scoping |
Recent changes
- Fleet TertiaryEngland and Wales, Thermal (gas, biomass, waste)Marked as Gate 1
- Fleet TertiaryEngland and Wales, Thermal (gas, biomass, waste)Connection date moved from 30 Nov 2025 to 7 Aug 2028 (+32 months)+32 mo
- Fleet Solar PVEngland and Wales, SolarConnection date moved from 13 Dec 2026 to 7 Aug 2028 (+20 months)+20 mo
- Fleet Solar PVEngland and Wales, SolarTechnology changed from Storage, Solar to Solar
- Fleet Solar PVEngland and Wales, SolarAdded to the registerNew
- Fleet TertiaryEngland and Wales, Thermal (gas, biomass, waste)Substation name updated in the register (from Fleet 400kV to Fleet 400kV Substation)
- Fleet TertiaryEngland and Wales, Thermal (gas, biomass, waste)Capacity changed from 57 MW to 47.5 MW
- Fleet TertiaryEngland and Wales, Thermal (gas, biomass, waste)Connection date moved from 1 May 2024 to 30 Nov 2025 (+19 months)+19 mo
- Fleet TertiaryEngland and Wales, Thermal (gas, biomass, waste)Connection date moved from 5 Jan 2024 to 1 May 2024 (+4 months)+4 mo
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?