FLEET GREEN LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Fleet EGH (Tertiary) | Fleet 400kV Substation | Storage with solar or wind | 47.5 | 13 Jan 2027 | Not stated | Consents Approved |
Recent changes
- Fleet EGH (Tertiary)England and Wales, Storage with solar or windStage 1: Capacity changed from 49.9 MW to 47.5 MW
- Fleet EGH (Tertiary)England and Wales, Storage with solar or windStage 1: Connection date moved from 31 Oct 2025 to 13 Jan 2027 (+14 months)+14 mo
- Fleet EGH (Tertiary)England and Wales, Storage with solar or windStage 1: Status changed from Awaiting Consents to Consents Approved
- Fleet EGH (Tertiary)England and Wales, Storage with solar or windStage removed (7.1 MW from 31 Oct 2026)
- Fleet EGH (Tertiary)England and Wales, Storage with solar or windCustomer changed from ENSO GREEN HOLDINGS LIMITED to Fleet Green Limited
- Fleet EGH (Tertiary)England and Wales, Storage with solar or windSubstation name updated in the register (from Fleet GSP to Fleet 400kV Substation)
- Fleet EGH (Tertiary)England and Wales, Storage with solar or windSubstation name updated in the register (from Fleet to Fleet GSP)
- Fleet EGH (Tertiary)England and Wales, Storage with solar or windSubstation name updated in the register (from Fleet 400kV to Fleet)
- Fleet EGH (Tertiary)England and Wales, Storage with solar or windRenamed from Fleet (Tertiary)
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?