DRAKELOW NG LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Drakelow Green Energy Centre | Drakelow 400kV Substation | Storage with solar or wind | 1,025 | 30 Apr 2028 | Not stated | Awaiting Consents |
Recent changes
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windCustomer changed from DRAKELOW GREEN ENERGY LIMITED to DRAKELOW NG LIMITED
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windStage removed (0 MW from 30 Oct 2037)
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windStage 1: Connection date moved from 30 Oct 2026 to 30 Apr 2028 (+18 months)+18 mo
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windStage 1: Technology changed from Storage, Solar to Demand, Storage, Solar
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windStage 2: Technology changed from Storage, Solar to Demand, Storage, Solar
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windNew stage added (0 MW from 30 Oct 2037)
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windCustomer changed from DRAKELOW NO LIMITED to DRAKELOW GREEN ENERGY LIMITED
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windCustomer changed from DRAKELOW GREEN ENERGY LIMITED to DRAKELOW NO LIMITED
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windRestructured from 1 stage (1,025 MW from 30 Oct 2026) to 2 stages (400 MW from 30 Oct 2026, 625 MW from 30 Oct 2029)
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windCapacity changed from 400 MW to 1,025 MW
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windSubstation name updated in the register (from Drakelow 400kV to Drakelow 400kV Substation)
- Drakelow Green Energy CentreEngland and Wales, Storage with solar or windAdded to the registerNew
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?