Walpole 400kV substations
England and Wales, National Grid Electricity Transmission
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Walpole | HOLLYGREEN ENERGYFARM LIMITED | Storage with solar or wind | 7.1 | 30 Oct 2030 | Not stated | Scoping |
Recent changes
- WalpoleEngland and Wales, Storage with solar or windCustomer changed from PIVOTED POWER LLP to HOLLYGREEN ENERGYFARM LIMITED
- WalpoleEngland and Wales, Storage with solar or windRestructured from 1 stage (49.9 MW connected) to 2 stages (7.1 MW from 30 Oct 2030, 49.9 MW connected)
- WalpoleEngland and Wales, Storage with solar or windCustomer changed from HOLLYGREEN ENERGYFARM LIMITED to PIVOTED POWER LLP
- WalpoleEngland and Wales, Storage with solar or windCustomer changed from PIVOTED POWER LLP to HOLLYGREEN ENERGYFARM LIMITED
- WalpoleEngland and Wales, Storage with solar or wind49.9 MW now connectedConnected
- WalpoleEngland and Wales, Storage with solar or windStatus changed from Under Construction/Commissioning to Built
- WalpoleEngland and Wales, Storage with solar or windConnection date moved from 12 Dec 2023 to 31 Oct 2022 (−13 months)−13 mo
- WalpoleEngland and Wales, Storage with solar or windConnection date moved from 31 Oct 2022 to 12 Dec 2023 (+13 months)+13 mo
- WalpoleEngland and Wales, Storage with solar or windStatus changed from Awaiting Consents to Under Construction/Commissioning
- WalpoleEngland and Wales, Storage with solar or windSubstation name updated in the register (from Walpole 400kV to Walpole 400kV Substation)
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?