Projects / Substation
Strathy South 132/33kV Substation
North Scotland, SSEN Transmission
1project in the register
208 MWstill to connect
208 MWof that with Gate 2 offers
0 MWconnected now
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Strathy South Wind | SSE GENERATION LIMITED | Onshore wind | 208 | 30 Sep 2030 +41 mo | Gate 2 | Consented |
Recent changes
- Strathy South WindNorth Scotland, Onshore windStatus changed from Scoping to Consented
- Strathy South WindNorth Scotland, Onshore windConnection date moved from 28 May 2027 to 30 Sep 2030 (+40 months)+40 mo
- Strathy South WindNorth Scotland, Onshore windGiven a Gate 2 connection offerGate 2
- Strathy South WindNorth Scotland, Onshore windConnection date moved from 25 Apr 2027 to 28 May 2027 (+1 month)+1 mo
QueueQuant
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose